Segment 4 (Lindale Bypass Route)
Length:
6.7 miles
Responsible Entity:
TxDOT
Project Type:
TOLL ROAD
From:
I-20
To:
US 69 North of Lindale
Initial Section:
2-Lane Undivided
Ultimate Section:
4-Lane Divided
Status:
Completed
Opened November 2018
Fact Sheet: Click to Download
EIS: Click to Download (No longer available)
Schematics: Click to Download
Draft EIS: Click to Download
Bidder Tabluation: Click to Download
Bridge Construction over I-20: Click to Download.
Toll 49 – Segment 4 was opened for traffic in November 2018. This project was originally developed by TxDOT as a relief route for the community of Lindale. Segment 4 extends from I-20 north to US 69 above Lindale.